 Step 1 - Move Preschool into Administration Building

   
         
    Step 1 of the consolidation plan is to move the preschool from the Deer Creek site to the main administration building. The lower level of the administrative building will accommodate four preschool classrooms along with a kitchenette space and improved access. Two of the preschool classrooms will include individual restrooms while the other two classrooms will include a shared restroom. A wet area is designed to accommodate student projects along with student cubbies for storage. New mechanical, electrical and plumbing systems will be provided for the new preschool spaces. A new playground is proposed that has an artificial turf area along with typical preschool playground equipment and play structures.

Below are current design drawings for the project. It is anticipated that this construction will begin summer of 2023. 
   
         
   

 Preliminary Conceptual Site Plan Test Fit

   
     The following site plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
     PCSD MP Preschool Site Plan 20230419    
         
     

Preliminary Conceptual Floor Plan Test Fit

   
    The following floor plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
         
    PCSD MP Preschool Floor Plan 20230419    
         
         
   

Preliminary Conceptual Renderings 

   
    The following renderings are used for CONCEPTUAL purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
         
    PCSD MP ECC Interior Rendering1 20230501    
         
    PCSD MP ECC Interior Rendering2 20230501    
         
    PCSD MP ECC Interior Rendering3 20230501    
         
         
    (Step 1)    Step 2   -  Step 3   -  Step 4    

    

  
 
 
Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     

 

 

Platte Canyon School District

Facilities Master Plan

 

   School District Website

  

Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update

   

  

 Step 2 - Consolidate Middle School with the High School

   
         
    Step 2 is a proposed consolidation of the Middle School with the High School. Based on current and projected future enrollment, the space available in the High School will accommodate both the middle school and high school programs. The majority of the middle school classrooms will be located on the main level, while the high school classrooms will be located on the upper level. It is anticipated that there will be shared specialized classrooms and programs such as science, art, drama, and special ed. This consolidation step is planned to be sequenced along with Step 3 that includes moving the elementary school into the existing Fitzsimmons facility.

Below are preliminary Test Fit Floor Plans for the project.
   
         
     

Preliminary Conceptual Floor Plan Test Fit

   
    The following floor plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
  PCSD MP Preschool Floor Plan 20230419  
         
         
    Step 1   -  (Step 2)   -  Step 3   -  Step 4    

    

  
 
 
Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     

 

 

Platte Canyon School District

Facilities Master Plan

 

   School District Website

  

Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update

   

  

 Step 3 - Move the Elementary School into Fitzsimmons

   
         
   

Step 3 proposes that the Deer Creek Elementary School be moved into the current Fitzsimmons Middle School facility. Based on classrooms spaces in the Fitzsimmons facility, the elementary school can operate with two classrooms per grade with four additional flex classrooms to accommodate growth or enrollment “bubbles”. Spaces such as cafeteria, kitchen, and gymnasium will be shared with the MS/HS to create a consolidated K-12 facility.

The Fitzsimmons site will be developed to accommodate elementary amenities including new parking, student drop-off lanes, bus drop-off and playgrounds.

This step consolidates campuses into one allowing the district to move out of the aging Deer Creek Elementary school facility. It is anticipated that the Deer Creek Elementary School property will be sold.

Conceptually, the elementary school should reflect the energy and enthusiasm of 5-11 year old students and create a welcoming environment for students, teachers, and the community. The conceptual images below begin to illustrate how the existing building could be transformed to accommodate Kindergarten through fifth grade students.

   
         
   

 Preliminary Conceptual Site Plan

   
     The following site plan is used for conceptual purposes only.
All improvements would be discussed with stakeholders to ensure the appropriate final design solution is implemented.
   
   

 PCSD MP Preschool Site Plan 20230419

Conceptual Site Plan

   
         
   

PCSD MP Prelim Conceptual Site and Playground 20231018

Conceptual Playground and Site Improvements

   
         
     

Preliminary Conceptual Floor Plan

   
   

The following floor plan is used for conceptual purposes only.
All future improvements are subject to stakeholder input through a future planning process.

 

   
   

PCSD MP Preschool Floor Plan 20230419

Conceptual Floor Plan

   
         
   

PCSD MP Prelim Conceptual Playground 20231018

Conceptual Playground

   
         
   

PCSD MP Prelim Conceptual Main Entry 20231018

Conceptual Main Entry

   
         
   

PCSD MP Prelim Conceptual Library 20231018

Conceptual Library

   
         
    Step 1   -  Step 2   -  (Step 3)   -  Step 4    

    

  
 
 
Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     

 

 

Platte Canyon School District

Facilities Master Plan

 

   School District Website

  

Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update

   

  

 Step 4 - Build Gym, CTE, Music, Stage, Fitness Area, Locker Rooms at High School

   
         
    The final consolidation step includes a building addition to the Platte Canyon High School including a music room, career technical education spaces, stage, fitness/weight room spaces, Gymnasium, and locker rooms.

This step allows the ability to move out of the district administration building and create a single K-12 facility as planned in the original master plan.
   
         
   

 Preliminary Conceptual Site Plan Test Fit

   
     The following site plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
     PCSD MP Preschool Site Plan 20230419    
         
         
    Step 1   -  Step 2   -  Step 3   -  (Step 4)    

    

  
 
 
Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     

 

 

Alamosa School District
Facilities Master Plan  

   

 

Almosa SD Logo 

 
   

Welcome!

Thank you for taking the time to familiarize yourself with the process and future goals of Platte Canyon School District!

In July 2021, Platte Canyon School District began the journey of developing a Facilities Master Plan, to serve as the framework for change and future decision making. This plan was created in collaboration with the school board, district personnel, parents and the professional planning and design team. This original Master Plan Information can be found at the links below.

   
         
     Process Overview    Research & Investigation    Master Plan     Implementation    
         
   

Following community sentiment and input regarding the two previous bond initiatives, the Platte Canyon School Board asked that a new approach be studied to fulfill the desired strategic plan of district consolidation. In early January of 2023, Platte Canyon School District assembled a Planning Advisory Team to review the Master Plan and look at updating the options for consolidation of School District facilities. Throughout the process, the goal of consolidating facilities remained the focus of the group. As a result, steps towards consolidation were identified and agreed upon. The 2023 Master Plan Update information can be found at the link below.

2023 Master Plan Update

   
     
 

Community, Students, Parents, and Teachers,

I’ve been with Platte Canyon School District for over 24 years as a teacher, coach, and administrator. Both of my own children are Platte Canyon graduates and attended preschool through high school in our system. I have witnessed first-hand the many achievements of our students in our school-related programs. Over the past two years the District has undertaken an extensive master planning process. Working with our consulting architects we have reviewed the conditions of our existing facilities and explored multiple master planning options with input from community members, District staff, teachers, and parents. Through this process we continue to focus on creating safe and appropriate educational environments. Through this master planning process, it has become apparent that circumstances continue to compel us to focus on upgrading our facilities in order to safely educate our students well into the future.

Simply, our current preK-5 campus, Deer Creek, needs major system upgrades (mechanical, electrical, grading, portable classrooms) over the next few years. In fact, the State of Colorado independently identified Deer Creek as the highest FCI score (weighted score of repairs) in the state. Though our elementary school is safe and functioning, the effort and resources required to maintain this building continue to increase.

Our middle school is also aging, and our high school is underutilized. Through our master planning process, we aim to consolidate our schools on one integrated preK – 12 campus at our current MS/HS site, drastically increasing safety and efficiency for our stakeholders.

To address our aging preschool facilities and as the first step in consolidating our campuses as part of our phased master plan, the PCSD1 Board of Education approved a preschool renovation project in the spring of 2023. As early as January 2024, the preschool will be moved to the Administration building on the MS/HS site, and our youngest students will enjoy a modern, safer space. This consolidation represents a start on what we anticipate will be an overall 17% reduction in the square footage maintained by the District, maximizing efficiency and district resources, while maintaining SF/student below state minimum standards. Consolidating campuses creates one true community focal point, one where all stakeholders can actively participate in our academic, extra-curricular, and after-school programs.

In order to fund the remainder of the phased master facilities plan, the District will continue to explore multiple funding options including grants such as the state BEST Program. In order to leverage the matching dollars of a BEST grant, strong community support is needed in the form of a bond in November of this year. Passing a bond in November will enable the District to convert the existing middle school into a modern elementary facility and will allow us to maximize space in the existing high school by moving the middle school students into that space, creating a 6-12 building.

We are very excited about the opportunities that the phased master plan will provide for our community, students, parents, and teachers and look forward to working with you to support our school District.

Mike Schmidt
PCSD Superintendent/PCHS Principal

 
   

 

 
 
 

 Process Overview    Research & Investigation     Master Plan     Implementation 

   2023 Master Plan Update

 
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     
     
     

 

 

Alamosa School District
Facilities Master Plan  

   

 

Almosa SD Logo 

 
   

Welcome!

Thank you for taking the time to familiarize yourself with the process and future goals of Platte Canyon School District!

In July 2021, Platte Canyon School District began the journey of developing a Facilities Master Plan, to serve as the framework for change and future decision making. This plan was created in collaboration with the school board, district personnel, parents and the professional planning and design team. This original Master Plan Information can be found at the links below.

   
         
     Process Overview    Research & Investigation    Master Plan     Implementation    
         
   

Following community sentiment and input regarding the two previous bond initiatives, the Platte Canyon School Board asked that a new approach be studied to fulfill the desired strategic plan of district consolidation. In early January of 2023, Platte Canyon School District assembled a Planning Advisory Team to review the Master Plan and look at updating the options for consolidation of School District facilities. Throughout the process, the goal of consolidating facilities remained the focus of the group. As a result, steps towards consolidation were identified and agreed upon. The 2023 Master Plan Update information can be found at the link below.

2023 Master Plan Update

   
     
 

Community, Students, Parents, and Teachers,

I’ve been with Platte Canyon School District for over 24 years as a teacher, coach, and administrator. Both of my own children are Platte Canyon graduates and attended preschool through high school in our system. I have witnessed first-hand the many achievements of our students in our school-related programs. Over the past two years the District has undertaken an extensive master planning process. Working with our consulting architects we have reviewed the conditions of our existing facilities and explored multiple master planning options with input from community members, District staff, teachers, and parents. Through this process we continue to focus on creating safe and appropriate educational environments. Through this master planning process, it has become apparent that circumstances continue to compel us to focus on upgrading our facilities in order to safely educate our students well into the future.

Simply, our current preK-5 campus, Deer Creek, needs major system upgrades (mechanical, electrical, grading, portable classrooms) over the next few years. In fact, the State of Colorado independently identified Deer Creek as the highest FCI score (weighted score of repairs) in the state. Though our elementary school is safe and functioning, the effort and resources required to maintain this building continue to increase.

Our middle school is also aging, and our high school is underutilized. Through our master planning process, we aim to consolidate our schools on one integrated preK – 12 campus at our current MS/HS site, drastically increasing safety and efficiency for our stakeholders.

To address our aging preschool facilities and as the first step in consolidating our campuses as part of our phased master plan, the PCSD1 Board of Education approved a preschool renovation project in the spring of 2023. As early as January 2024, the preschool will be moved to the Administration building on the MS/HS site, and our youngest students will enjoy a modern, safer space. This consolidation represents a start on what we anticipate will be an overall 17% reduction in the square footage maintained by the District, maximizing efficiency and district resources, while maintaining SF/student below state minimum standards. Consolidating campuses creates one true community focal point, one where all stakeholders can actively participate in our academic, extra-curricular, and after-school programs.

In order to fund the remainder of the phased master facilities plan, the District will continue to explore multiple funding options including grants such as the state BEST Program. In order to leverage the matching dollars of a BEST grant, strong community support is needed in the form of a bond in November of this year. Passing a bond in November will enable the District to convert the existing middle school into a modern elementary facility and will allow us to maximize space in the existing high school by moving the middle school students into that space, creating a 6-12 building.

We are very excited about the opportunities that the phased master plan will provide for our community, students, parents, and teachers and look forward to working with you to support our school District.

Mike Schmidt
PCSD Superintendent/PCHS Principal

 
   

 

 
 
 

 Process Overview    Research & Investigation     Master Plan     Implementation 

   2023 Master Plan Update

 
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     
     
     

 

 

Alamosa School District
Facilities Master Plan  

   

 

Almosa SD Logo 

 
   

Welcome!

Thank you for taking the time to familiarize yourself with the process and future goals of Platte Canyon School District!

In July 2021, Platte Canyon School District began the journey of developing a Facilities Master Plan, to serve as the framework for change and future decision making. This plan was created in collaboration with the school board, district personnel, parents and the professional planning and design team. This original Master Plan Information can be found at the links below.

   
         
     Process Overview    Research & Investigation    Master Plan     Implementation    
         
   

Following community sentiment and input regarding the two previous bond initiatives, the Platte Canyon School Board asked that a new approach be studied to fulfill the desired strategic plan of district consolidation. In early January of 2023, Platte Canyon School District assembled a Planning Advisory Team to review the Master Plan and look at updating the options for consolidation of School District facilities. Throughout the process, the goal of consolidating facilities remained the focus of the group. As a result, steps towards consolidation were identified and agreed upon. The 2023 Master Plan Update information can be found at the link below.

2023 Master Plan Update

   
     
 

Community, Students, Parents, and Teachers,

I’ve been with Platte Canyon School District for over 24 years as a teacher, coach, and administrator. Both of my own children are Platte Canyon graduates and attended preschool through high school in our system. I have witnessed first-hand the many achievements of our students in our school-related programs. Over the past two years the District has undertaken an extensive master planning process. Working with our consulting architects we have reviewed the conditions of our existing facilities and explored multiple master planning options with input from community members, District staff, teachers, and parents. Through this process we continue to focus on creating safe and appropriate educational environments. Through this master planning process, it has become apparent that circumstances continue to compel us to focus on upgrading our facilities in order to safely educate our students well into the future.

Simply, our current preK-5 campus, Deer Creek, needs major system upgrades (mechanical, electrical, grading, portable classrooms) over the next few years. In fact, the State of Colorado independently identified Deer Creek as the highest FCI score (weighted score of repairs) in the state. Though our elementary school is safe and functioning, the effort and resources required to maintain this building continue to increase.

Our middle school is also aging, and our high school is underutilized. Through our master planning process, we aim to consolidate our schools on one integrated preK – 12 campus at our current MS/HS site, drastically increasing safety and efficiency for our stakeholders.

To address our aging preschool facilities and as the first step in consolidating our campuses as part of our phased master plan, the PCSD1 Board of Education approved a preschool renovation project in the spring of 2023. As early as January 2024, the preschool will be moved to the Administration building on the MS/HS site, and our youngest students will enjoy a modern, safer space. This consolidation represents a start on what we anticipate will be an overall 17% reduction in the square footage maintained by the District, maximizing efficiency and district resources, while maintaining SF/student below state minimum standards. Consolidating campuses creates one true community focal point, one where all stakeholders can actively participate in our academic, extra-curricular, and after-school programs.

In order to fund the remainder of the phased master facilities plan, the District will continue to explore multiple funding options including grants such as the state BEST Program. In order to leverage the matching dollars of a BEST grant, strong community support is needed in the form of a bond in November of this year. Passing a bond in November will enable the District to convert the existing middle school into a modern elementary facility and will allow us to maximize space in the existing high school by moving the middle school students into that space, creating a 6-12 building.

We are very excited about the opportunities that the phased master plan will provide for our community, students, parents, and teachers and look forward to working with you to support our school District.

Mike Schmidt
PCSD Superintendent/PCHS Principal

 
   

 

 
 
 

 Process Overview    Research & Investigation     Master Plan     Implementation 

   2023 Master Plan Update

 
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     
     
     

 

 

Alamosa School District
Facilities Master Plan  

   

 

Almosa SD Logo 

 
   

Welcome!

Thank you for taking the time to familiarize yourself with the process and future goals of Platte Canyon School District!

In July 2021, Platte Canyon School District began the journey of developing a Facilities Master Plan, to serve as the framework for change and future decision making. This plan was created in collaboration with the school board, district personnel, parents and the professional planning and design team. This original Master Plan Information can be found at the links below.

   
         
     Process Overview    Research & Investigation    Master Plan     Implementation    
         
   

Following community sentiment and input regarding the two previous bond initiatives, the Platte Canyon School Board asked that a new approach be studied to fulfill the desired strategic plan of district consolidation. In early January of 2023, Platte Canyon School District assembled a Planning Advisory Team to review the Master Plan and look at updating the options for consolidation of School District facilities. Throughout the process, the goal of consolidating facilities remained the focus of the group. As a result, steps towards consolidation were identified and agreed upon. The 2023 Master Plan Update information can be found at the link below.

2023 Master Plan Update

   
     
 

Community, Students, Parents, and Teachers,

I’ve been with Platte Canyon School District for over 24 years as a teacher, coach, and administrator. Both of my own children are Platte Canyon graduates and attended preschool through high school in our system. I have witnessed first-hand the many achievements of our students in our school-related programs. Over the past two years the District has undertaken an extensive master planning process. Working with our consulting architects we have reviewed the conditions of our existing facilities and explored multiple master planning options with input from community members, District staff, teachers, and parents. Through this process we continue to focus on creating safe and appropriate educational environments. Through this master planning process, it has become apparent that circumstances continue to compel us to focus on upgrading our facilities in order to safely educate our students well into the future.

Simply, our current preK-5 campus, Deer Creek, needs major system upgrades (mechanical, electrical, grading, portable classrooms) over the next few years. In fact, the State of Colorado independently identified Deer Creek as the highest FCI score (weighted score of repairs) in the state. Though our elementary school is safe and functioning, the effort and resources required to maintain this building continue to increase.

Our middle school is also aging, and our high school is underutilized. Through our master planning process, we aim to consolidate our schools on one integrated preK – 12 campus at our current MS/HS site, drastically increasing safety and efficiency for our stakeholders.

To address our aging preschool facilities and as the first step in consolidating our campuses as part of our phased master plan, the PCSD1 Board of Education approved a preschool renovation project in the spring of 2023. As early as January 2024, the preschool will be moved to the Administration building on the MS/HS site, and our youngest students will enjoy a modern, safer space. This consolidation represents a start on what we anticipate will be an overall 17% reduction in the square footage maintained by the District, maximizing efficiency and district resources, while maintaining SF/student below state minimum standards. Consolidating campuses creates one true community focal point, one where all stakeholders can actively participate in our academic, extra-curricular, and after-school programs.

In order to fund the remainder of the phased master facilities plan, the District will continue to explore multiple funding options including grants such as the state BEST Program. In order to leverage the matching dollars of a BEST grant, strong community support is needed in the form of a bond in November of this year. Passing a bond in November will enable the District to convert the existing middle school into a modern elementary facility and will allow us to maximize space in the existing high school by moving the middle school students into that space, creating a 6-12 building.

We are very excited about the opportunities that the phased master plan will provide for our community, students, parents, and teachers and look forward to working with you to support our school District.

Mike Schmidt
PCSD Superintendent/PCHS Principal

 
   

 

 
 
 

 Process Overview    Research & Investigation     Master Plan     Implementation 

   2023 Master Plan Update

 
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     
     
     

 

RTA logo
◆  Architecture
■  Master Planning
●  Interior Design
19 South Tejon Street, Suite 300
Colorado Springs, CO 80903
(719) 471-7566