Platte Canyon School District

Facilities Master Plan

 

    School District Website

         
    Welcome Page    Process Overview    Research & Investigation    Master Plan     Implementation    
         
   

Proposed Master Plan

  PK 12 MP Option

 

PK-12 CONSOLIDATED CAMPUS

The PK-12 master plan option recommends the consolidation of all PCSD students into one facility. It proposes a campus reconfiguration that will ultimately reduce the maintained campus square footage by over 35% or 89,000 sq feet and eliminates the travel distance between two separate campuses of 8 miles.

The middle school and high school will be consolidated into the current Platte Canyon High School building built in 2000. Current enrollment for middle and high school students combined is 426 students and the high school building has an educational capacity of 651 students. There is still room to grow even when 6-12 grades are consolidated. This building is the newest and in the best condition of all district facilities. It will require only minor renovations to achieve the middle/high school program consolidation including select paint, carpeting and minor door and wall re-configuration at the classroom groups.

The aging Fitzsimmons Middle School will be demolished and, in its place, a two-story elementary and preschool addition will be added to the west to complete the transformation of Platte Canyon High School into a PK-12 facility. PK-5 enrollment is currently 413 students which brings the potential PK-12 building enrollment to 829 student. The existing kitchen will be shared by all students with a dedicated eating area for the elementary school grades and the former Fitzsimmons Middle School gymnasium will be re-purposed as the elementary school gymnasium.

A gymnasium addition is proposed to the east of the current Platte Canyon High School building which will house a shared middle/high school gymnasium, locker rooms, a stage with an adjacent drama room, a music room, a fitness room and the consolidated administration offices. This addition will improve student safety by eliminating student travel across the parking lot on a daily basis to the high school gymnasiums, auditorium and fitness facilities currently located in the administration building. The consolidation of facilities allows the District to consolidate administration space, student resources and other shared educational resources such as the library, art, music, gymnasium, and special education spaces.

   
    PCSD PK 12 Option 03 08 2022     
         
   
   
   

 Program and Preliminary Test Fits

In order to test the proposed consolidated PK-12 facility, space charts were created. The charts are used as a tool to define space needs for all levels, but also verify student capacity and overall fit within the proposed option. The following links take you to the space chart spreadsheets for both the PK-5 portion of the facility and the 6-12 portion of the facility.

K-5 Space Program    6-12 Space Program

   
   

   
   

Preliminary Conceptual Site Plan TEST FIT 

The following site plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
 

   
   

 PCSD MP Site 03 08 2022

 

   
    PCSD MP Site 03 08 2022     
         
   

Preliminary Conceptual Floor Plan TEST FIT 

The following floor plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
 

 
   
   

PCSD MP ES Addition 03 08 2022

 

   
   

PCSD MP HS MS Addition 03 08 2022

 

   

 

 
 
  Welcome Page   Process Overview    Research & Investigation    Master Plan     Implementation  
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org