Gunnison Watershed School District
School Facilities Digital Open House

 

Proposed Improvement Projects

    

Home
 
Lake Preschool & Kindergarten  
 
Gunnison Community School
 
Gunnison High School & Pathways
 
Crested Butte Community School
 
Project Cost Summary

 

 

 

Lake Preschool & Kindergarten

 
     
 

Overview of Needs: Renovated in 2009, the Lake School functions very well and generally meets the needs of the students and community. The facility houses the Pre-school and Kindergarten programs and includes District Administration offices. The facility has the ability to accommodate enrollment projections into the future, however, there are safety, program, and maintenance improvements that have been identified as deficient. The following projects are planned:


Safety: Improvements to increase the visibility from the administration and reception area to better monitor visitors coming to the facility are included in the project. The entry vestibule will also be improved with a new transaction window, electronic locks, and door hardware consistent with other proposed vestibule improvements across the district.


Safety: To address the need for improved vehicular and pedestrian circulation, upgrades to the parking lot and student drop-off lane are proposed. These alterations provide safer dedicated pedestrian routes to the school entry, improve student drop-off lanes, and provide dedicated parking for walk-in preschool student check-in. The sidewalk along Boulevard Street is extended South to Arthur Avenue to increase the bus drop-off length and connect the school site to the surrounding community and the Safe Route to School.


Safety & Maintenance: Other exterior improvements are planned including upgrading the playground surfacing from wood chips to a poured rubber surface. Seasonal shade structures are needed at the playgrounds to meet code and provide improved spaces for outdoor activities.  


Explore the plans and links below to see what relevant, exciting, and important improvements are proposed for the Lake School!

 
     

     
 

Facility Deficiencies

 
 

 The following items have been identified as building and site deficiencies during the Master Plan process and will be addressed in the proposed improvements. Reference the Master Plan document for additional information;

 
     
 
Health and Safety Maintenance Ed Program and Spaces Community and Collaboration Sustainability and Wellness
  • Improve vehicular and pedestrian traffic patterns to and from the site
  • Improve dedicated building entry vestibule to control building access
  • Add facilities within the building to support good hygiene
  • Replace PVC windows
  • Provide Mechanical System Controls
  • Provide seasonal shade structure to improve quality of outdoor play areas
  • Extend sidewalk along the West side of the site to connect to the community
  • Integrate mechanical controls to monitor and regulate energy usage
 
 
 

Download Deferred Maintenance Cost

 
     

     
 

Proposed Site Plan

 
  Click on the plus (+) icons below for additional information describing proposed improvements.  
   
PARENT DROP-OFF/PICK-UP

PARENT DROP-OFF/PICK-UP

To reduce congestion in the existing parking lot, the site circulation will be reconfigured to improve traffic flow and locate parent drop of near the main building entrance. The improvements will better accommodate parents walking their students into the building, improve capacity for dropping of at the front door and create better connections to the safe routes to school sidewalks.

FD11000

PARKING LOT

Reconfigure the parking lot to improve site circulation for cars and pedestrians. This re-striping will increase the number of parking spaces and better accommodate needs at this facility.

FD11000

RESURFACE PLAYGROUND

RESURFACE PLAYGROUND

Replace existng wood chips with poured rubber fall protection to reduce maintenance and improve safety of the playground and surrounding space. Selected pieces of playground equipment will be replaced with new equipment to expand offerings and improve accessible optons for disabled students.

FD11101

SEASONAL SHADE STRUCTURE

SEASONAL SHADE STRUCTURE

A seasonal shade structure to help shade the guests, students and staff from the sun when necessary but can be removed when the sun is welcoming.

FD10110

SNOW GUARDS

Snow guards and snow melt systems will be installed to prevent snow and ice pack from avalanching, reducing hazards to people and damage property below.

FD10001

RE-SURFACE PLAYGROUND

RE-SURFACE PLAYGROUND

Replace existng wood chips with poured rubber fall protection to reduce maintenance and improve safety of the playground and surrounding space. Selected pieces of playground equipment will be replaced with new equipment to expand offerings and improve accessible optons for disabled students.

FD11101

SEASONAL SHADE STRUCTURES

SEASONAL SHADE STRUCTURES

A seasonal shade structure to help shade the guests, students and staff from the sun when necessary but can be removed when the sun is welcoming.

FD10110

  • PARENT DROP-OFF/PICK-UP

    PARENT DROP-OFF/PICK-UP

    To reduce congestion in the existing parking lot, the site circulation will be reconfigured to improve traffic flow and locate parent drop of near the main building entrance. The improvements will better accommodate parents walking their students into the building, improve capacity for dropping of at the front door and create better connections to the safe routes to school sidewalks.

    FD11000

  • PARKING LOT

    Reconfigure the parking lot to improve site circulation for cars and pedestrians. This re-striping will increase the number of parking spaces and better accommodate needs at this facility.

    FD11000

  • RESURFACE PLAYGROUND

    RESURFACE PLAYGROUND

    Replace existng wood chips with poured rubber fall protection to reduce maintenance and improve safety of the playground and surrounding space. Selected pieces of playground equipment will be replaced with new equipment to expand offerings and improve accessible optons for disabled students.

    FD11101

  • SEASONAL SHADE STRUCTURE

    SEASONAL SHADE STRUCTURE

    A seasonal shade structure to help shade the guests, students and staff from the sun when necessary but can be removed when the sun is welcoming.

    FD10110

  • SNOW GUARDS

    Snow guards and snow melt systems will be installed to prevent snow and ice pack from avalanching, reducing hazards to people and damage property below.

    FD10001

  • RE-SURFACE PLAYGROUND

    RE-SURFACE PLAYGROUND

    Replace existng wood chips with poured rubber fall protection to reduce maintenance and improve safety of the playground and surrounding space. Selected pieces of playground equipment will be replaced with new equipment to expand offerings and improve accessible optons for disabled students.

    FD11101

  • SEASONAL SHADE STRUCTURES

    SEASONAL SHADE STRUCTURES

    A seasonal shade structure to help shade the guests, students and staff from the sun when necessary but can be removed when the sun is welcoming.

    FD10110

 
     

     
 

Proposed Building Plans 

 
 

 Level 1 - Proposed Plan

 
  Click on the plus (+) icons below for additional information describing proposed improvements.  
   
SECURE ENTRY VESTIBULE

SECURE ENTRY VESTIBULE

The entry will be modified to accommodate district standards for safety and security. Intrusion resistant film will be applied to the glass surrounding the reception to resist forced entry. An audio/video doorbell will be installed at the entry to control who is able to enter the school from the exterior. A new electronic door locking system will allow staff to check visitor credentials before allowing the visitors to gain access to the building. Visual control of the building administration will be improved.

FD11000

HAND WASH STATION

HAND WASH STATION

To encourage good sanitation practices and improve student health, new hand washing stations will be installed throughout the school.

FD11010

PRIVACY SCREEN IN RESTROOM

New urinal screens are to be installed where needed to improve privacy and sanitation.

FD10001

PRIVACY SCREEN IN RESTROOM

New urinal screens are to be installed where needed to improve privacy and sanitation.

FD10001

  • SECURE ENTRY VESTIBULE

    SECURE ENTRY VESTIBULE

    The entry will be modified to accommodate district standards for safety and security. Intrusion resistant film will be applied to the glass surrounding the reception to resist forced entry. An audio/video doorbell will be installed at the entry to control who is able to enter the school from the exterior. A new electronic door locking system will allow staff to check visitor credentials before allowing the visitors to gain access to the building. Visual control of the building administration will be improved.

    FD11000

  • HAND WASH STATION

    HAND WASH STATION

    To encourage good sanitation practices and improve student health, new hand washing stations will be installed throughout the school.

    FD11010

  • PRIVACY SCREEN IN RESTROOM

    New urinal screens are to be installed where needed to improve privacy and sanitation.

    FD10001

  • PRIVACY SCREEN IN RESTROOM

    New urinal screens are to be installed where needed to improve privacy and sanitation.

    FD10001

 
     
   
  Download Summary  
 
     
     
 
Home
 
Lake Preschool & Kindergarten  
 
Gunnison Community School
 
Gunnison High School & Pathways
 
Crested Butte Community School
 
Project Cost Summary
 

     
 
  Please share your questions, comments, suggestions, and concerns with us. This information will go to GWSD School Board and Administration for consideration and a response should you request one.   
 
     
 

FEEDBACK

 
     
 

Additional Links / Information

 
 

Homepage
School District Website
Adopted Master Plan
CDE Insight Facilities Assessments
GWSD Air Quality & Energy Report
Design Advisory Group (DAG) Presentations & Meeting Minutes

 
     

  Thank you for taking your time to review the proposed school improvements.
If you have any additional questions, please email feedback@gunnisonschools.net
 
     

 

 