Gunnison Community School

 
     
 

Overview of Needs: Originally built in 1996 and with upgrades completed in 2010, the Gunnison Community School continues to meet many of the first grade through eighth grade school needs. Enrollment at GCS indicates growth that the school can accommodate within existing classroom facilities into the near future, though adequate capacity to accommodate school lunches continues to be a need.  Changes in school health and security standards and increased space needs to support current educational practices have led to recommendations for improvements. 

Safety:
At GCS, the proposed solution for increased security includes moving the Administration to the exterior corner of the building to improve visibility to outside spaces and control of a single-entry point to the building with an entry sequence that meets industry standards for school safety.

Maintenance: The library space will be renovated to meet the ever-changing needs for collaboration space within schools.  Included within the Library area is a new shared maker space to provide a resource for project-based learning and flexible furniture throughout.

Maintenance: The Achievement Center (severe needs special education program) is in need of access to daylight and views for students who spend the majority of their day inside an interior classroom.  Counseling, nursing, and other special service offices will be renovated into a cohesive student services area.

Overcrowding: To address the need for more cafeteria capacity, this area will be expanded in size by moving the administration and will include provisions to utilize the student gallery through the use of glass overhead doors. Serving lines will be expanded to allow adequate lunch service.

Maintenance: Exterior improvements include engineering, draining, and improved turf to two multi-sport athletic fields behind GCS to meet the needs of GCS and district-wide athletic programs. The existing playground equipment and surfaces will be replaced to improve the quality of outdoor play and improve drainage issues.

Maintenance: Addressing heating efficiency is a key priority. Energy audits found this facility to be using significantly more energy than other buildings in the district.  Improvements include the addition of continuous exterior insulation, replacement of original windows, and conversion of the mechanical system to a highly energy efficient system.   


Explore the plans and links below to see what relevant, exciting and important improvements are proposed for Gunnison Community School!

 
     
 
 
Scan the QR Code for a Virtual Experience of your school!
QR Code GHS Ski Lab

QR How to web

How it works!
  1. Open the QR Code reader or Camera on your phone.
  2. Hold your device over the QR Code so that it's clearly visible within your smartphone's screen.
  3. If necessary, press the button or popup.
  4. Have fun!
 
 

 

Facility Deficiencies

 
   The following items have been identified as building and site deficiencies during the Master Plan process and will be addressed in the proposed improvements. Reference the Master Plan document for additional information;  
     
 
Health and Safety Maintenance Ed Program and Spaces Community and Collaboration Sustainability and Wellness
  • Integrate additional measures to meet current safety standards for schools
  • Add facilities to support good hygiene in the school building and playfield area
  • Renovate and upgrade existing mechanical system to improve energy efficiency
  • Perform general maintenance on the building envelope
  • Replace depreciated interior finishes
  • Repair damaged / worn flooring
  • Modify interior space to support project-based learning and collaboration
  • Renovate to provide multi-purpose educational spaces that foster current and future educational partnerships with outside entities
  • Modify interior space to support project-based learning and collaboration
  • Integrate mechanical controls to monitor and regulate energy usage
  • Renovate and upgrade existing mechanical system to improve energy efficiency
  • Install Solar Panel Array
  • Improve student connection to outdoor space, natural light, and views
 
     
 

Download Deferred Maintenance Cost

 
     

     
 

Proposed Site Plan

 
  Click on the plus (+) icons below for additional information describing proposed improvements.  
 
OUTDOOR PLAY AREA

OUTDOOR PLAY AREA

The outdoor play area will be improved, structures will be replaced or updated as required, new fall surface will be installed and site drainage will be improved.

FD11010

 

BIKE PARKING

Bike parking on the property will be increased to accommodate and promote the increased use by bicycling commuters.

FD11010

BIKE PARKING

Bike parking on the property will be increased to accommodate and promote the increased use by bicycling commuters.

FD11010

PLAY FIELDS

Expand the felds to address the need for a district soccer field and meet the growing needs of the Gunnison Community School. Two regulation combination soccer/football fields will be provided with access to relocated field events (long jump, discus and shot put). Bleachers will be provided at the north field to accommodate spectators and provide a place for down valley soccer games to be scheduled.

FD10001

  • OUTDOOR PLAY AREA

    OUTDOOR PLAY AREA

    The outdoor play area will be improved, structures will be replaced or updated as required, new fall surface will be installed and site drainage will be improved.

    FD11010

     

  • BIKE PARKING

    Bike parking on the property will be increased to accommodate and promote the increased use by bicycling commuters.

    FD11010

  • BIKE PARKING

    Bike parking on the property will be increased to accommodate and promote the increased use by bicycling commuters.

    FD11010

  • PLAY FIELDS

    Expand the felds to address the need for a district soccer field and meet the growing needs of the Gunnison Community School. Two regulation combination soccer/football fields will be provided with access to relocated field events (long jump, discus and shot put). Bleachers will be provided at the north field to accommodate spectators and provide a place for down valley soccer games to be scheduled.

    FD10001

 
     

     
 

Proposed Building Plans 

 
 

 Level 1 - Proposed Plan

 
  Click on the plus (+) icons below for additional information describing proposed improvements.  
   
SECURE ENTRY VESTIBULE

SECURE ENTRY VESTIBULE

The entry will be modified to accommodate district standards for safety and security. Intrusion resistant film will be applied to the glass surrounding the reception to resist forced entry. An audio / video doorbell will be installed at the entry to control who is able to enter the school from the exterior.  A new electronic door locking system will allow staff to check visitor credentials before allowing the visitors to gain access to the building. Visual control of the building administration will be improved.

FD11000

STUDENT GALLERY

STUDENT GALLERY

Administration offices will be relocated to open up the vaulted corridor ceiling, creating a daylit space for the cafeteria to expand into.  The Library, Achievement Center and Student Resources areas will also be relocated and connect to the new Student Gallery.  The space will be a dynamic, inviting and energizing hub for the school.

FD11110

ADMINISTRATION

ADMINISTRATION

Administration offices will be relocated to the southwest corner of the existing building. The move will allow for the offices to receive windows or views to the main visitor entrance improving access control.  The daylight will create a more comfortable environment for staff to work in; and increase passive and direct supervision and control to the entrance. Counseling and student services will be relocated adjacent to administration and remain centrally located to the student population and engage with the new student gallery.

FD11010

LIBRARY AND MAKER SPACE

LIBRARY AND MAKER SPACE

The library will now include mobile, flexible casework, new technology and a collaboration spaces; creating a learning environment aligned to current education needs. A new shared Maker Space will be provided to support project-based learning opportunities for all students.

FD01110

HAND WASH STATION

HAND WASH STATION

To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

FD11010

HAND WASH STATION

HAND WASH STATION

To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

FD11010

HAND WASH STATION

HAND WASH STATION

To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

FD11010

EXPANDED SERVERY AND DINNING AREA

EXPANDED SERVERY AND DINNING AREA

The kitchen servery will be expanded to improve student circulation. Large doors will be added to provide additional seating at lunchtime within the Student Gallery and increase capacity. Additional hand washing stations will be included within the cafeteria to promote student health.

FD11110

IMPROVE ACHIEVEMENT CENTER

IMPROVE ACHIEVEMENT CENTER

Special Education and Counseling will be relocated within the buidling and be adjacent to one another to create a new Achievement Center. The relocation will provide daylight and views to these areas, and be centrally located in the building to provide equall access for all students.

FD01110

SINGLE STALL RESTROOM

Single stall restrooms will be installed to provide more restroom access during school days. These restrooms also provide a family restroom option during school events and functions.

FD11010

SINGLE STALL RESTROOM

Single stall restrooms will be installed to provide more restroom access during school days. These restrooms also provide a family restroom option during school events and functions.

FD11010

MIDDLE SCHOOL CTE SUITE

MIDDLE SCHOOL CTE SUITE

An overhead coiling door will be added between the Tech Classroom and the Fabrication shop to support design and fabrication classes working in both areas simultaneously.  A garage door to the exterior will provide outdoor access for large project exploration. The dust collection unit will be relocated to prevent damage from falling ice and minimize noise into classroom areas.

FD01111

  • SECURE ENTRY VESTIBULE

    SECURE ENTRY VESTIBULE

    The entry will be modified to accommodate district standards for safety and security. Intrusion resistant film will be applied to the glass surrounding the reception to resist forced entry. An audio / video doorbell will be installed at the entry to control who is able to enter the school from the exterior.  A new electronic door locking system will allow staff to check visitor credentials before allowing the visitors to gain access to the building. Visual control of the building administration will be improved.

    FD11000

  • STUDENT GALLERY

    STUDENT GALLERY

    Administration offices will be relocated to open up the vaulted corridor ceiling, creating a daylit space for the cafeteria to expand into.  The Library, Achievement Center and Student Resources areas will also be relocated and connect to the new Student Gallery.  The space will be a dynamic, inviting and energizing hub for the school.

    FD11110

  • ADMINISTRATION

    ADMINISTRATION

    Administration offices will be relocated to the southwest corner of the existing building. The move will allow for the offices to receive windows or views to the main visitor entrance improving access control.  The daylight will create a more comfortable environment for staff to work in; and increase passive and direct supervision and control to the entrance. Counseling and student services will be relocated adjacent to administration and remain centrally located to the student population and engage with the new student gallery.

    FD11010

  • LIBRARY AND MAKER SPACE

    LIBRARY AND MAKER SPACE

    The library will now include mobile, flexible casework, new technology and a collaboration spaces; creating a learning environment aligned to current education needs. A new shared Maker Space will be provided to support project-based learning opportunities for all students.

    FD01110

  • HAND WASH STATION

    HAND WASH STATION

    To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

    FD11010

  • HAND WASH STATION

    HAND WASH STATION

    To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

    FD11010

  • HAND WASH STATION

    HAND WASH STATION

    To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

    FD11010

  • EXPANDED SERVERY AND DINNING AREA

    EXPANDED SERVERY AND DINNING AREA

    The kitchen servery will be expanded to improve student circulation. Large doors will be added to provide additional seating at lunchtime within the Student Gallery and increase capacity. Additional hand washing stations will be included within the cafeteria to promote student health.

    FD11110

  • IMPROVE ACHIEVEMENT CENTER

    IMPROVE ACHIEVEMENT CENTER

    Special Education and Counseling will be relocated within the buidling and be adjacent to one another to create a new Achievement Center. The relocation will provide daylight and views to these areas, and be centrally located in the building to provide equall access for all students.

    FD01110

  • SINGLE STALL RESTROOM

    Single stall restrooms will be installed to provide more restroom access during school days. These restrooms also provide a family restroom option during school events and functions.

    FD11010

  • SINGLE STALL RESTROOM

    Single stall restrooms will be installed to provide more restroom access during school days. These restrooms also provide a family restroom option during school events and functions.

    FD11010

  • MIDDLE SCHOOL CTE SUITE

    MIDDLE SCHOOL CTE SUITE

    An overhead coiling door will be added between the Tech Classroom and the Fabrication shop to support design and fabrication classes working in both areas simultaneously.  A garage door to the exterior will provide outdoor access for large project exploration. The dust collection unit will be relocated to prevent damage from falling ice and minimize noise into classroom areas.

    FD01111

 
     
 

Level 2 - Proposed Plan

 
 
ADD HANDWASH STATIONS

ADD HANDWASH STATIONS

To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

FD11010

  • ADD HANDWASH STATIONS

    ADD HANDWASH STATIONS

    To encourage good sanitation practices and improved student health, new hand washing stations will be installed throughout the school.

    FD11010

 
     
   
  Download Summary  
 
     
     
 
Home
 
Lake Preschool & Kindergarten  
 
Gunnison Community School
 
Gunnison High School & Pathways
 
Crested Butte Community School
 
Project Cost Summary
 

     
 
  Please share your questions, comments, suggestions, and concerns with us. This information will go to GWSD School Board and Administration for consideration and a response should you request one.   
 
     
 

FEEDBACK

 
     
 

Additional Links / Information

 
 

Homepage
School District Website
Adopted Master Plan
CDE Insight Facilities Assessments
GWSD Air Quality & Energy Report
Design Advisory Group (DAG) Presentations & Meeting Minutes

 
     

  Thank you for taking your time to review the proposed school improvements.
If you have any additional questions, please email feedback@gunnisonschools.net
 
     

 

 

RTA logo
◆  Architecture
■  Master Planning
●  Interior Design
19 South Tejon Street, Suite 300
Colorado Springs, CO 80903
(719) 471-7566