Platte Canyon Elementary School Renovation
After completing a master plan update in 2023, Platte Canyon School District again retained RTA to convert the existing Fitzsimmons Middle School to become a K-5 elementary school, one of the goals identified during the master plan.
Elementary Schools
Project Details
Size: 26,930 sf
Cost: $15M
Design Details
- Collaborative design process
- BEST Grant Assistance
- Conversion of existing middle school into elementary school
- Flexible learning environments
- Photos by Vic Moss
The program was designed with adaptability in mind, organized around a two-and-a-half-round elementary school. Two classrooms for each grade are provided, with three flex classrooms to readily accommodate additional students in any single grade. Exploratory classroom spaces include dedicated science, technology, music, and art spaces. The proposed K-5 program will accommodate a student capacity of approximately 368 students.
As part of the Master Plan process, RTA generated a space program for the Platte Canyon Elementary School as a test fit for solutions. This iterative process with the master planning advisory team provided insight into the size of a proposed elementary school based on enrollment and future enrollment projections. Through the design advisory group process, the space program was adjusted based on specific space requirements for the elementary school.