Holly Hills Elementary School

Denver, Colorado

After successfully passing their 2024 bond, Cherry Creek Schools set out to consolidate the existing Holly Hills Elementary School and the Holly Ridge Elementary School into one new school located on the existing Holly Hills site. The new Holly Hills Elementary School will be a modern, functional, and innovative facility. 

 Elementary Schools

Project Details

Size: 86,000 sf

Cost: $58M 

Design Details

  • New construction
  • Collaborative design process
  • Innovative 21st Century learning spaces with connections to the outdoors
  • Interior design reflects the unique, multicultural student population
cherry creek schools holly hills elementary corridor
cherry creek schools holly hills elementary k lc

The school will feature flexible learning environments, breakout spaces, a centrally located Innovation Center, and direct access to the outdoors. The diverse student body includes individuals from over 27 countries. To honor this diversity, the interior design was inspired by the world’s geography and the variations found on each continent. With a theme of continents connected by oceans, each learning community features distinct shapes, signage, and imagery based on one of the continents. Just as oceans connect the continents, the hallways feature colors and patterns inspired by the ocean. Common spaces like the cafeteria bring all of the colors together, reflecting the shared nature of the space.

cherry creek schools holly hills elementary cafeteria

The design team worked in close collaboration with the District through a Design Advisory Group process and user group meetings to craft a design catered to the school’s unique and diverse student population.  

RTA logo
◆  Architecture
■  Master Planning
●  Interior Design
19 South Tejon Street, Suite 300
Colorado Springs, CO 80903
(719) 471-7566