Platte Canyon School District

Facilities Master Plan

 

   School District Website

  

Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update

   

  

 Step 1 - Move Preschool into Administration Building

   
         
    Step 1 of the consolidation plan is to move the preschool from the Deer Creek site to the main administration building. The lower level of the administrative building will accommodate four preschool classrooms along with a kitchenette space and improved access. Two of the preschool classrooms will include individual restrooms while the other two classrooms will include a shared restroom. A wet area is designed to accommodate student projects along with student cubbies for storage. New mechanical, electrical and plumbing systems will be provided for the new preschool spaces. A new playground is proposed that has an artificial turf area along with typical preschool playground equipment and play structures.

Below are current design drawings for the project. It is anticipated that this construction will begin summer of 2023. 
   
         
   

 Preliminary Conceptual Site Plan Test Fit

   
     The following site plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
     PCSD MP Preschool Site Plan 20230419    
         
     

Preliminary Conceptual Floor Plan Test Fit

   
    The following floor plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
         
    PCSD MP Preschool Floor Plan 20230419    
         
         
   

Preliminary Conceptual Renderings 

   
    The following renderings are used for CONCEPTUAL purposes only.
All future improvements are subject to stakeholder input through a future planning process.
   
         
    PCSD MP ECC Interior Rendering1 20230501    
         
    PCSD MP ECC Interior Rendering2 20230501    
         
    PCSD MP ECC Interior Rendering3 20230501    
         
         
    (Step 1)    Step 2   -  Step 3   -  Step 4    

    

  
 
 
Welcome Page   Process Overview   Research & Investigation   Master Plan    Implementation    2023 Master Plan Update
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Education (CDE) Assessment
School District Website

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: rkorthuis@pcsdk12.org
 
     

 

RTA logo
◆  Architecture
■  Master Planning
●  Interior Design
19 South Tejon Street, Suite 300
Colorado Springs, CO 80903
(719) 471-7566