Montrose County School District

Master Capital Plan

 

    School District Website

         
    Welcome Page   Process Overview    Research & Investigation     Master Capital Plan     Implementation    
         
   

Strategic Plan

   
   

Select from the Icons below for more information about each District Priority and identified improvement projects:

priority1 iconpriority2 iconpriority3 iconpriority4 iconpriority5 iconpriority6 iconpriority7 icon

 
 
 

   header priority 1

 

 
    Through the planning process, the career technical education spaces and technology learning labs at Olathe Middle High School were identified as areas of improvement. There is the need to expand the technical education with a new technology learning lab in the high school portion of the school. The career technical education spaces including the industrial arts shop and supporting classrooms will be removed and replaced with state-of-the-art CTE learning spaces and associated equipment. Improved site access, student drop off and accessible entrance are also needed at this campus. In addition, parking needs to be expanded to provide more spaces for events.    
         
    Identified Projects:    
         
   
 
  1. Building addition and renovation at Olathe MS/HS
  2. Complete a building addition and renovation to improve technology learning and career technical education spaces. This project includes adjusting the student drop-off drive and building entry sequence to improve accessibility to the main entry of the building. Additional parking to the north will be added for overflow parking. The CTE woodshop/welding/auto/ag shop will be replaced with new state of the art spaces with updated equipment, flexible learning spaces, and collaboration spaces. An interior renovation within the existing building is planned to create a flexible technology learning lab and collaboration spaces for students in the HS portion of the building. This will be similar in function to the existing lab in the MS. A renovation will also occur to improve the existing flexible technology learning lab in the MS portion of the school.

      1. Approximate Demolition Area: 8,500 sq. ft.
      2. Approximate New Construction Area: 10,000 sq. ft.
      3. Approximate Heavy Renovation Area: 8,500 sq. ft.
      4. Approximate Light Renovation Area: 21,500 sq. ft. (estimate)
      5. Additional Information
        1. Estimated Project Costs:
                • Construction Costs (from FCI):     $11,143,011
                • Owner Soft Costs (25%):              $2,785,752
                • Owner Contingency (15%):           $1,671,451
                • Total:                                             $15,600,214
        2. Concept Planning Construction Cost Estimate (by FCI)
 
 

Preliminary Conceptual Site Plan TEST FIT 

The following site plan is used for TEST FIT purposes only.
All future improvements are subject to stakeholder input through a future planning process.

Priority 6 Olathe Middle High site plan test fit

 
   

 

Select from the Icons below for more information about each District Priority and identified improvement projects:

priority1 iconpriority2 iconpriority3 iconpriority4 iconpriority5 iconpriority6 iconpriority7 icon

 
 
  Welcome Page   Process Overview    Research & Investigation     Master Capital Plan     Implementation  
 
 
 

Quick Links / Additional Information

 
 

BEST Program Information
Colorado Department of Energy (CDE) Assessment
School District Website
Montrose Childcare Needs Assessment

 
     
  Thank you for taking the time to review and consider the Master Planning Process.
Feel free to share your thoughts by email with us at: feedback@mcsd.org
 
     

 