facebook-icon  linkedin-icon      (719) 471-7566

Holly PreK-12Holly, Colorado

Uncategorised

Article Count:
2

About

Article Count:
3

News

Article Count:
112

Contact

Article Count:
4

Testimonials

Article Count:
1

In Patient Hospitals

Article Count:
1

Staff

Article Count:
41

Positions

Article Count:
2

East Otero

Article Count:
6

Cheraw

Article Count:
3

archuleta-county

Article Count:
3
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

"I don’t know if I’ve said it before but Holly is definitely lucky to have Rick on the project. Best CA I’ve ever seen: quick turnaround on observation reports, really an advocate for the owner, very knowledgeable, thorough submittal review with good turnaround times, scrutinizes CO’s and Pay Apps, etc., etc.”

Matt Hahn, Project Manager Catalyst Planning Group, LLC

Colorado’s BEST program gave Holly the boost it needed to build a new school that would become a source of pride and joy for the town. Holly PreK-12 provides a center for learning and personal interaction for the greater Holly community. The agricultural setting of the school gave RTA a great springboard for design of the facility.

The interior design of the school reflects the regional, rural materials and forms one finds in Holly Colorado. Using earth tones and textures, combined with geometries found in aerial surveys of the location, RTA created a very contemporary and welcoming high performance school.

With design elements, such as exposed polished concrete floors, repurposed reclaimed wood from the existing school, exposed tubular daylighting device tubes that transmit daylight to the first level, and tack-able graphic mural walls, occupants of the building experience a connection to their community and history of the area.

  • Client: Holly School District
  • Renovation Area: 8,824 square feet (WPA era gymnasium)
  • New Construction Area: 93,348 sqaure feet

Accolades

  • 2013 Peak Design Award for New Construction, CEFPI, Rocky Mountain Chapter
  • LEED Gold Certified