"RTA developed a visionary solution that connected and blended the two existing buildings and remodeled a number of learning spaces to fit the new concept. The construction was successfully completed in occupied space with an at-risk student population.”

Don Orr, Executive Director of Bond Planning, Engineering and Construction, Boulder Valley School District

In order to meet Boulder Valley School District’s educational program expansion, RTA designed a new two-classroom addition to the existing 800 student Aspen Creek K-8 school.

The project scope of work included 6,000 square feet of addition; however, the Design Advisory Group (DAG) identified additional issues with the educational program which required relocation. The DAG reevaluated and relocated educational program areas with little cost to the District, which further clarified and met their educational objectives.

Site circulation issues were identified with parent and bus drop off loops. Solutions to correct the issues provided a separate Early Childhood Education playground complete with an outdoor chalkboard for both student and staff use.